Construction Material Round Steel Tube
Payment Type: | L/C,T/T,Western Union |
---|---|
Incoterm: | FOB,CFR,CIF |
Min. Order: | 10 Metric Ton |
Delivery Time: | 20 Days |
Basic Info
Type: Cast Iron Pipes
Usage: Oil Pipe
Joint Type: Self Anchoring Joint
Section Shape: Round
Certification: ISO2531, EN545
Shape: Round
Customized: Customized
Gasket Material: NR
Standard: API, ASTM, BS, DIN, GB, JIS, API 5L
Application: Structure Pipe, Construction,gas,oil
Surface Treatment: Galvanized/oil Coated/painted
Material: SS400,Q195,Q235,Q345,ASTM A106
Secondary Or Not: Non-secondary
Additional Info
Packaging: as ur requirements
Productivity: 5000 Ton/Tons per Month
Brand: Dongshengyuan
Transportation: Ocean,Land
Place of Origin: China
Supply Ability: 5000 Ton/Tons per Month
Certificate: CE, ISO
Product Description
Construction,machine structure pipe, Agriculture equipment pipe, Water and gas pipe, Greenhouse pipe, Scaffolding pipe, Building material tube, Furniture tube, Low pressure fluid tube, Oil pipe, etc
Usage of the pipe: For oil pipe, casing, line pipe in petroleum and natural gas, structure pipe, water and gas, also for chemical industry , water and gas, also for chemical industry.
Surface: Bare, Varnished, Zinc coating, Anti-corrosion, 3PE, PE/PP/EP/FBE. etc.
Packing:
1> Big OD: In bulk ;
2> Small OD: Packaged in bundles by steel strip ;
3> According to the requirements of the customers
Product
gi galvanzied round steel tube
Specification
Section shape: round
Thickness: 0.8mm-2.5mm
Outer diameter: 20mm-219mm
Zinc coating: >50g/m2
Standard
BS1387,GB3091,ASTMA53, B36.10, BS EN1029, API 5L, GB/T9711 etc
Material
Q195, Q235, Q345; ASTM A53 GrA,GrB; STKM11,ST37,ST52, 16Mn,etc.
Fabrication
Plain ends, cutting, threading, etc
Surface Treatment
1. Galvanized
2. PVC,black and color painting
3. Transparent oil,anti-rust oil
4. According to clients requirement
Package
1. Bundle
2. Bulk
3. Plastic bags ,etc
Min order
10 tons, more quantity price will be lower
Payment terms
T/T, L/C at sight, western union etc.
Deliver time
Within 7-30 days after deposit, ASAP